Tuesday, July 12, 2016

Finished?

The inspection with the manufacturer was this morning, and they are gone.  There a a couple of minor things they're going to address, but that could take a couple of weeks. The contractor was here and pointed out a few things he noticed yesterday, as well.  The tile may be done by the end of the month.  So we've started moving back in. The lights have been left on, in the pictures, both over the stove and over the sink.  I had been very worried about the fridge.  Yesterday the contractor told David about a gadget that would fit under the fridge and roll it in, that could be bought at Walmart.  I wasn't sure what had been arranged, since this wasn't covered on our contract, but when we got home from the doctor's, the fridge was in place in all it's glory.  I had envisioned David and I trying to wrestle with it.  I can't tell you how happy it made me to see it sitting there.  On the down side, we have discovered that we aren't covered for the replacement of the underground pipe in the front yard.  Evidently, we are covered if it was leaking, but not if it is plugged, and the contractor 's price to repair the valve in house doubles, if they have to come back, after the initial job is finished.




No comments:

Post a Comment